DC Products

Express Plus

Express Plus is a scalable DC fast charging station for electric vehicles (EVClosed Electric Vehicle). It consists of Power BlockPower Link 1000, and, if required, Power Hub. Installing the Express Plus requires at least two people and takes approximately 3-4 hours per system component.

View the documentation

Express 280

Installing the Express 280 requires two people and takes approximately 3-4 hours. This time estimate does not include the time needed to pull DC and Ethernet cable for a Paired installation if it is not already done. Paired installation also requires contacting a ChargePoint support technician to perform any required software updates and configuration.

View the documentation

Express 250

Installing the Express 250 requires two people and takes approximately 3-4 hours. This time estimate does not include the time needed to pull DC and Ethernet cable for a Paired installation if it is not already done. Paired installation also requires contacting a ChargePoint support technician to perform any required software updates and configuration.

View the documentation

Pantograph

Simplify charging in your depot with a reliable, high-powered Pantograph solution. Expand your charging infrastructure and save space as your fleet grows.

View the documentation

DC Miscellaneous

The DC Miscellaneous section includes a curated set of documents that do not fall under the core categories of our structured documentation but are nonetheless essential for comprehensive understanding, operational continuity, or supplemental reference.

View the documentation