DC Products
Express
Express is ChargePoint’s next generation DC charging platform that delivers high-power, scalable EV
Electric Vehicle charging across standalone, distributed, and hybrid deployments. Designed to maximize vehicle throughput and minimize cost, it helps commercial operators grow revenue and enables fleets to lower deployment and operating expenses.
|
|
View the documentation |
Express Plus
Express Plus is a scalable DC fast charging station for electric vehicles (EV
Electric Vehicle). It consists of Power BlockPower Link 1000, and, if required, Power Hub. Installing the Express Plus requires at least two people and takes approximately 3-4 hours per system component.
|
|
View the documentation |
Pantograph
Simplify charging in your depot with a reliable, high-powered Pantograph solution. Expand your charging infrastructure and save space as your fleet grows.
|
|
View the documentation |
Express 280
Installing the Express 280 requires two people and takes approximately 3-4 hours. This time estimate does not include the time needed to pull DC and Ethernet cable for a Paired installation if it is not already done. Paired installation also requires contacting a ChargePoint support technician to perform any required software updates and configuration.
|
|
View the documentation |
Express 250
Installing the Express 250 requires two people and takes approximately 3-4 hours. This time estimate does not include the time needed to pull DC and Ethernet cable for a Paired installation if it is not already done. Paired installation also requires contacting a ChargePoint support technician to perform any required software updates and configuration.
|
|
View the documentation |
DC Miscellaneous
The DC Miscellaneous section includes a curated set of documents that do not fall under the core categories of our structured documentation but are nonetheless essential for comprehensive understanding, operational continuity, or supplemental reference.
|
|
View the documentation |