Express 250 Construction Signoff Form
Submit this form and required photos to installdispatch@chargepoint.com. Review datasheets, site design, and installation guides defining ChargePoint specifications at: ChargePoint Product Reference Documentation.
All installations must comply with local and regional code. ChargePoint provides concrete pad guidance in the Express 250 Site Design Guide that is applicable for most sites; however, pad sizes may vary. Ensure site drawings have been completed and approved by a structural engineer for this site.
|
Customer Information |
|
|---|---|
|
Customer name |
|
|
Customer contact name |
|
|
Customer contact phone |
|
|
Customer contact email |
|
|
Site Information |
|
|---|---|
|
Street and number |
|
|
City |
|
|
State |
|
|
Country |
|
|
Post code Zip code |
|
|
Number of stations to be installed |
|
|
Number of paired stations to be installed |
|
|
Estimated construction start date |
|
|
Estimated installation and commissioning date |
|
|
Site Contractor Information |
|||
|---|---|---|---|
|
Contractor type
|
|
||
|
|||
|
Contractor company name |
|
||
|
Contractor site lead name |
|
||
|
Contractor site lead phone |
|
||
|
Contractor site lead email |
|
||
|
Installer Information |
|||
|---|---|---|---|
|
Installer type |
|
||
|
|||
|
Installation company name |
|
||
|
Installer contact name |
|
||
|
Installer contact phone |
|
||
|
Installer contact email |
|
||
If the station installer arrives to install the charging station and finds these items incomplete, you will incur a separate re-dispatch fee.
Take the following photos for each location throughout the site construction process.
|
Required Pictures |
|
|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Civil Work |
|
|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Electrical Work |
|||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
|
||||||||||||||||||||
|
|
|
||||||||||||||||||||
|
|
|
||||||||||||||||||||
|
|
|
||||||||||||||||||||
|
|
|
||||||||||||||||||||
|
|
|
||||||||||||||||||||
|
Site Comments |
|---|
|
|
I, _______________________________________________ hereby certify that the scope of work in this form has been correctly completed.
|
Signature |
Date |
|---|---|
|
|
|
|
|