Operation

This section provides operation instructions for Power Hub.

  • Power on: Power Hub is powered on by the installation team at the site’s electrical panel, immediately after completing the Power Hub system installation.

  • Power off: Power Hub does not need to be powered off except during maintenance or service. Refer to the Power Hub Service Guide to power off and de-energize the Power Hub.