October, 2026

In the Prepare for Installation chapter:

  • Added an IMPORTANT note stating that conduits must not have bell ends.

  • Added cross-references to the wire specification appendices for North America and Europe.

  • Updated the quantity of lifting straps from two to four in the Express Solo Package section.

In the Mount Express Solo chapter:

  • Added steps and updated illustrations for securing jig alignment plates with anchor bolt nuts before wire pulling and removing them afterward.

  • Added an IMPORTANT note and illustration specifying that auxiliary wires must not be pulled before cabinet mounting.

  • Moved the Connect Charging Cables to Cable Management System section before Open Doors and Remove Safety Covers, changed the procedure from optional to mandatory, and added a holstering step.

  • Updated the Lift Assembly section to show four lifting straps when using a forklift to lift Express Solo.

  • Added and updated CAUTION statements to prevent cables from being pinched or crushed during cabinet lowering.

Appendices:

July 2026

The following updates were made:

May 2026

The following updates were made:

October 2025 Update HV DCClosed High Voltage Direct Current nomenclature, wire specifications, and Ethernet shield grounding requirement.

August 2025