Introduction
CP800 stations are alternating current (AC) charging stations, capable of delivering up to 22 kW (three phase) of power to an electric vehicle (EV
Electric Vehicle). They feature metering compliant with calibration law and backend connectivity via OCPP
Open Charge Point Protocol 2.0.1 and can be used in semi-public and public areas with billing based on energy consumption.
Follow the instructions in this guide and heed all warnings.
Before the CP800 is installed, ensure that the technical specifications and any additional national installation requirements have been considered. Refer to CP800 Operation and Maintenance Guide.
Required Tools and Materials
To install ChargePoint Flex Pro charging stations, you need the following tools and materials:
|
|
4 mm (3/16 in) drill bit |
|
T20 torx screwdriver with torque setting |
|
|
10 mm (3/8 in) nut setter |
|
Flat blade (4.5 mm) screwdriver with torque setting |
|
|
Wire stripper |
|
Bubble level |
|
|
Hand-held drill |
|
QR |
|
|
Smartphone with internet connectivity |
|
ChargePoint installer login credentials |
|
|
ChargePoint Installer app |
|
ChargePoint Driver app |
|
|
Ethernet cable with RJ45 plug (if Ethernet is required) |
|
Wires and RJ12 plug for Energy Management (optional) |
Inspect the Box for Contents
Check to ensure you have the following parts before you begin to install:
-
Charging station
-
Backplate
-
Quick start guide
-
Three 6 mm (3/8 in) x 51 mm (2 in) lag screws
-
Three masonry anchors
-
M25 cable gland
-
Locking screw