Install Cable Clamps

Perform the following steps to install the cable clamps:

  1. Uncoil the charging cable by gently extending it all the way out and away from the station. Rotate the plug as needed to remove any twist or kinks.

    Technical illustration depicts the procedural step.

  2. Position the charging cable near the base of the station.

    Technical illustration depicts the procedural step.

  3. Align the knot bearing on each rope to its corresponding mating feature on the cable clamp.

    Technical illustration depicts the procedural step.

  4. Using tool provided, turn the knot bearing clockwise approximately 1/4 turn. You may need to push down while turning the knot bearing.

    Ensure no gap exists between the top cap and the ball.

    Technical illustration depicts the procedural step.

  5. Untie the knot near the top of the CMKClosed Cable Management Kit.

    Technical illustration depicts the procedural step.

    Technical illustration depicts the procedural step.

  6. Check that the charging cable extends and retracts fully and smoothly.

    Technical illustration depicts the procedural step.

  7. Insert the charging cables into their corresponding holsters.

    Technical illustration depicts the procedural step.