Vehicle Communication Board
To replace the SEVB
Smart Ethernet Vehicle Board (Vehicle Communications Board) inside PD Controller, perform the following steps:
Required Tools and Materials
|
|
T20 Screwdriver |
|
Mobile elevating work platform (scissor lift), as needed |
Before You Begin
Replace the SEVB
-
Use T20 screwdriver, and loosen the screws (x2).
Torque these screws to 1.13 Nm (10 in-lb).
-
Disconnect the cables connectors (x7) from the SEVB
Smart Ethernet Vehicle Board.
-
Lift the SEVB
Smart Ethernet Vehicle Board vertically to disengage it from the keyhole slots, then remove it from the mounting surface. -
Reverse the above steps to reinstall with replacement SEVB
Smart Ethernet Vehicle Board.
- To adhere to ChargePoint best practices, complete the post-service checklist before you leave the site.
-
For assistance or to return a faulty part to ChargePoint, go to chargepoint.com/support and contact technical support using the appropriate region-specific number.