Mount the Pedestal

Perform the following steps to mount the pedestal:

  1. Confirm that the location has been prepared according to the Site Design Guide by visiting ChargePoint Product Reference Documentation.

  2. You should see the following:

      Indicate Yes or No
    Add Comments
    1. Concrete mounting template

    Yes

    No

     
    1. Three bolts set into concrete

    Yes

    No

     
    1. Two nuts and three washers on each bolt

    Yes

    No

     
    1. Template front

    Yes

    No

     
    1. Bolts extending 60 mm (2 1/3 in) to 100 mm (4 in)

    Yes

    No

     
    1. Conduit stub-up measuring 152 mm (6 in) to 590 mm (2 ft)

    Yes

    No

     
    1. Approximately 1.5 m (5 ft) of service wiring,
      including Ethernet wiring (if the station supports Ethernet)

    Yes

    No

     
    1. CPF50 adapter cover (only if replacing CPF50)

    Yes

    No

     

    Labeled diagram of product, tools or parts. Labeled diagram of product, tools or parts.

  3. Remove top nuts and washers.

  4. Adjust the lower nuts as necessary to be level.

    Removing the lower nuts or washers might cause the housing to become misaligned which could potentially damage the station.

  5. Place the pedestal over the conduit and route the wiring through the pedestal.

    Avoid damaging the conduit.

  6. Ensure the pedestal is facing the parking space.
  7. Fasten the pedestal to the bolts and hand tighten the nuts.

  8. Ensure pedestal is level and plumb.

    Verify accuracy after each adjustment by positioning the level at various locations on the pedestal, above each bolt.

  9. Torque the top nuts to 120 Nm (88 ft-lb).