Power Off
- Before any procedure, disconnect the power.
- Follow local code and site lockout/tagout procedure to de-energize the station.
- Wait for energy to dissipate (approximately five minutes).
- Keep power off until all covers and panels are reinstalled and the work is complete.
-
Identify which units need servicing. You must power off all upstream units.
-
Refer to the site plan:
Locate the units to be serviced on the site plan and determine where to power off (all upstream units).
-
End all charging sessions and activity for those units.
Failure to end the charging session before beginning service could damage hardware components. Such damaged components may need to be replaced, and this may be costly. -
Power off the Power Link 1000 and all upstream units as follows:
-
Disconnect power at the site electrical panel.
-
Wait the required time for energy to dissipate (see label on the product).
-
Connected components will power off.
-
-
-
Use a multimeter to confirm that power is off.
-
Lift each charging cable off the holster.