Mount Auxiliary Components to Schunk SLS 201

Overview and Parts Needed

A mounting frame attaches the Wi-FiClosed Wireless Fidelity antenna, RFIDClosed Radio Frequency IDentification antenna, and status LED to the Schunk SLS 201 pantograph.

Labeled diagram of product, tools or parts.

  1. Mounting frame rail, right

  2. Mounting frame rail, left

  3. Wi-FiClosed Wireless Fidelity antenna assembly

  4. RFIDClosed Radio Frequency IDentification antenna assembly

  5. Mounting frame cover, rear

  6. Mounting frame cover, front

  7. Mounting frame side cover, right

  8. Mounting frame side cover, left

  9. Status LED

To prepare for auxiliary components installation, find the following parts from the Auxiliary Components Kit:

  • All parts listed above

  • M16 bolt and flange nut (x4 each)

Install Side Rails

  1. Align the right side rail to the pantograph aid mounting supports.

    The right side rail has a cutout notch to accommodate the pantograph electric control unit. The left side rail does not.

    Technical illustration depicts the procedural step.

  2. Install M16 bolt and flange nut at mounting supports (x2 fastener sets total) to fasten rail. Torque to 94.9 Nm (70 ft-lb).

    Technical illustration depicts the procedural step.

  3. Repeat above steps to install the left side rail on the pantograph.

    Technical illustration depicts the procedural step.

Install Wi-Fi and RFID Antenna Assemblies

  1. Loosen (do not remove) the M6 nuts (x8) at the rear of the left and right rails.

    Technical illustration depicts the procedural step.

  2. Install the RFIDClosed Radio Frequency IDentification assembly onto the left and right rails. Slide the assembly until the keyholes lock on the mounting studs.

    Technical illustration depicts the procedural step.

  3. Tighten the M6 nuts (x4). Torque to 5.6 Nm (50 in-lb).

    Technical illustration depicts the procedural step.

  4. Install the Wi-FiClosed Wireless Fidelity assembly onto the left and right rails. Slide the assembly until the keyholes lock on the mounting studs.

    Technical illustration depicts the procedural step.

  5. Tighten the M6 nuts (x4). Torque to 5.6 Nm (50 in-lb).

    Technical illustration depicts the procedural step.

Install Front Cover And Status LED

  1. Loosen (do not remove) M5 nuts (x3) on the status LED.

    Technical illustration depicts the procedural step.

  2. Install the status LED on the front cover at keyholes.

    Technical illustration depicts the procedural step.

  3. Slide the status LED until the mounting studs lock in the keyholes. Torque M5 nuts (x3) to 4.5 Nm (40 in-lb).

    Technical illustration depicts the procedural step.

  4. Loosen (do not remove) M6 nuts (x4) on the front cover.

    Technical illustration depicts the procedural step.

  5. Install the front cover assembly onto the left and right rails. Slide the cover until it locks into the keyholes.

    Technical illustration depicts the procedural step.

  6. Tighten the M6 nuts (x4). Torque to 5.6 Nm (50 in-lb).

    Technical illustration depicts the procedural step.

Save Parts

Save the following parts of the auxiliary components mounting frame for later installation:

  • Rear cover

  • Side covers

These parts will not install until after cables are connected to the antennas. See Complete Schunk SLS 201.102 Auxiliary Components Frame.