Prepare Power Block Pad
To prepare the Power Block pad, complete the following steps:
-
Ensure all stub-ups are at least 610 mm (24 in) high. If armored cable is used, strip the outer jacket to the same height.
-
Remove plastic caps.
-
Use a wire brush to clean bolt threads. Alternatively, use a spare hex nut and run it down the stub-ups to clean the threads.
-
Install one washer and one nut onto each bolt. Torque to 54 Nm (40 ft-lb).

-
Washer and nut should be flush against concrete.
-
If epoxied, do not exceed the epoxy torque rating.
-
-
Install washers and leveling nuts. Maintain ~6.4 mm (1/4 in) between each leveling nut and bottom nut.
-
Check the leveling nuts.