Power Link 2000 Troubleshooting

This section is aimed to help Industrial Support Engineers, field technicians, and the Commissioning team in identifying problems and performing initial debug of the problems related to Power Link 2000.

The troubleshooting steps for the following components' faults are included in this section:

  • Ethernet switch (SSLAN)

  • Control and Communication Module (UCB)

  • Metering, distribution, and safety board (MDS)

  • Smart cable (SEVB)

  • Contactor switch (Proton)

  • Power Link 2000 controller

  • Cooling controller board (CCB)

  • Cable (SEVB)

Inside view of Power Link 2000