Contents
| Home |
|
| Icons Used in Documentation |
|
| Important Safety Instructions |
|
| Important Safety Instruction for Home (Flex) Products |
|
| Important Safety Instruction for AC Products |
|
| Important Safety Instruction for AC Eichrecht Products |
|
| Important Safety Instruction for DC Products |
|
| Important Safety Instruction for DC Eichrecht Products |
|
| Important Safety Instruction for Panto Down |
|
| Home Products |
|
| CPH50 |
|
| Electrician's Pre-Installation Tips |
|
| Revision History |
|
| Introduction |
|
| Apply the Electrical Ratings Label |
|
| Wire the Circuit |
|
| Mount the Charging Station |
|
| Install the Charging Cable |
|
| Complete the Installation |
|
| Fault Codes |
|
| Revision History |
|
| Introduction |
|
| Power Cord Replacement |
|
| Holster Ball Assembly Replacement |
|
| NACS Conversion and Cable Replacement Kit |
|
| CP800 |
|
| CP800 (Europe) |
|
| Revision History |
|
| Introduction |
|
| Install the Backplate |
|
| Wire the Charging Station |
|
| Install the Charging Station |
|
| Complete Station Setup |
|
| Optional Energy Management Settings |
|
| Unlock Charging Station |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| ChargePoint Platform |
|
| Troubleshooting |
|
| Technical Information |
|
| Conformity - Metering and Calibration Law (Eichrecht) |
|
| EV Ready |
|
| UK Specific Information |
|
| Revision History |
|
| Introduction |
|
| Head Unit Replacement |
|
| Faceplate Removal Replacement |
|
| Backplate Removal and Replacement |
|
| Energy Managment Accessory Replacement |
|
| Revision History |
|
| Introduction |
|
| Meter Dimension and MID Labels |
|
| Data Protection |
|
| Interface Description |
|
| Technical Specifications |
|
| Videos |
|
| Fleet |
|
| CPF50 |
|
| Revision History |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Mounting Options |
|
| Revision History |
|
| Introduction |
|
| Install a Wall Mount CPF50 (Without a CMK) |
|
| Install a Wall Mount CPF50 Bracket and CMK |
|
| Install the Pedestal |
|
| Mount a Single Station Bracket (Without a CMK) |
|
| Mount a Single Station Bracket and CMK |
|
| Mount a Dual Station Bracket (Without a CMK) |
|
| Mount a Dual Station Bracket and CMK |
|
| Install the Station and Charging Cable |
|
| Complete Station Setup |
|
| Installation Checklist |
|
| Appendix: Power Sharing Kit |
|
| Pedestal Mount Concrete Preparation |
|
| Revision History |
|
| Introduction |
|
| Install the Pedestal |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| Reporting |
|
| Verify Station Wiring and Voltage |
|
| Revision History |
|
| Introduction |
|
| Latch Replacement |
|
| Replace the Cable Management Kit |
|
| NACS Cable Replacement |
|
| Gateway |
|
| Gateway for ChargePoint CPF Series Charging Stations |
|
| Gateway LTE for ChargePoint CPF Series Charging Stations |
|
| AC Products |
|
| CP6000 |
|
| CP6000 (North America) |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Install a Pedestal Mount |
|
| Mount the Pedestal |
|
| Install the Housing |
|
| Install the CMK (Optional) |
|
| Mount the Brackets |
|
| Mount the CMK |
|
| Prepare the Housing |
|
| Install the Housing |
|
| Install the Conduit |
|
| Connect Wiring |
|
| Install Circuit Sharing Jumpers |
|
| Install the Power Plate |
|
| Connect the Wiring |
|
| Check Voltages |
|
| Assemble the Station |
|
| Install Cable Clamps |
|
| Complete Station Setup |
|
| Next Steps |
|
| Start a Charging Session |
|
| Installation Checklist |
|
| Appendix: Install the USB to Ethernet Module |
|
| Revision History |
|
| Introduction |
|
| Cloud Dashboard and Reports |
|
| Revision History |
|
| Introduction |
|
| Replace the Head Assembly |
|
| Replace the Control and Communications Module |
|
| Replace the Smart Cable Assemblies |
|
| Replace the Lens |
|
| Replace the SIM Card |
|
| Replace the CMK |
|
| Replace a Wall Mount |
|
| Replace the Cable Clamps |
|
| Replace the Power Plate |
|
| Replace the Top Cap |
|
| Replace the Holster |
|
| Replace Retractor Cord |
|
| Replace the EMV Chip Reader |
|
| CP6000 (Europe) |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Install a Pedestal Mount |
|
| Mount the Pedestal |
|
| Install the Housing |
|
| Install the CMK (Optional) |
|
| Install a Wall Mount |
|
| Mount the CMK (Optional) |
|
| Prepare the Housing |
|
| Install the Housing |
|
| Install the Conduit |
|
| Connect Wiring |
|
| Configure Cable (Circuit) Sharing |
|
| Install the Power Plate |
|
| Connect the Wiring |
|
| Wiring Diagrams |
|
| Check Voltages |
|
| Guidelines for Stations Supplied With Single Phase Power |
|
| Check Voltages |
|
| Assemble the Station |
|
| Connect the Head Assembly |
|
| Install Rating Labels |
|
| Install Cable Clamps |
|
| Complete Station Setup |
|
| Next Steps |
|
| Start a Charging Session |
|
| Installation Checklist |
|
| Protection Labels |
|
| Tampered or Damaged Labels (Seals) on Eichrecht-Compliant Charging Stations |
|
| Calibration Authority Notification |
|
| Install the USB to Ethernet Module |
|
| Install the USB to Ethernet Module |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| Cloud Dashboard and Reports |
|
| Revision History |
|
| Introduction |
|
| Replace the Head Assembly |
|
| Replace the Control and Communications Module |
|
| Replace the CMK |
|
| Install the Reset Switch |
|
| Replace the Power Plate |
|
| Replace the Smart Cable Assemblies |
|
| Replace the Top Cap |
|
| Replace a Holster |
|
| Introduction |
|
| Remove CP4000 |
|
| Install CP6000 Adapter Plate |
|
| CPIM1000 Integrated Meter Guide (Eichrecht) |
|
| CPIM1000 Integrated Meter Guide |
|
| Protection Labels |
|
| CP4000 |
|
| Revision History |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Pedestal Mount Concrete Preparation |
|
| Networked Charging Station Quick Reference Guide |
|
| Revision History |
|
| Prepare for the Installation |
|
| Build the Pedestal |
|
| Mount the Charging Station |
|
| Wire the Charging Station |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Revision History |
|
| Prepare for Installation |
|
| Mount the Charging Station |
|
| Wire the Charging Station |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Revision History |
|
| Prepare for the Installation |
|
| Build the Mounting Bracket |
|
| Build the Pedestal |
|
| Install the Charging Station |
|
| Wire the Charging Station |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Revision History |
|
| Prepare for Installation |
|
| Install the CMK |
|
| Install the Station Mounting Bracket |
|
| Mount the Charging Station |
|
| Wire the Charging Station |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| Reporting |
|
| CT4000 |
|
| Revision History |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Station Wiring Verification for CT4000 |
|
| Pedestal Mount |
|
| Pedestal Mount |
|
| Pedestal Mount Concrete Preparation |
|
| Pole Mount Kit Installation Guide |
|
| Revision History |
|
| Introduction |
|
| Install a Pedestal Mount CT4000 |
|
| Install a Wall Mount CT4000 |
|
| Install Head Assembly and Top Cap |
|
| Complete Station Setup |
|
| Installation Checklist |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| Reporting |
|
| Revision History |
|
| Introduction |
|
| Head Assembly Replacement |
|
| Replace Power Plate |
|
| Replace the Latch |
|
| Replace Signs |
|
| Replace Lens |
|
| Replace Retractor Cord |
|
| Remediate the Rope Clip |
|
| Verify Smooth Operation of the Rope |
|
| Attach the New Rope to the Charge Cable |
|
| Field Upgrades |
|
| Field Upgrade Procedure: CAT 1 MultiTech Modem |
|
| Field Upgrade Procedure: CAT 3 MultiTech Modem |
|
| Field Upgrade Procedure: CAT 4 MultiTech Modem |
|
| Cellular Signal Reading |
|
| Revision History |
|
| Verify Station Wiring and Voltage |
|
| DC Products |
|
| Express |
|
| Express Solo |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Introduction |
|
| Prepare for Installation |
|
| Mount Express Solo |
|
| Connect Wires |
|
| Set Up Charging Cables |
|
| Install Covers and Close |
|
| Complete Installation Checklist |
|
| Appendix: Low Clearance Forklift Bracket Lift |
|
| Appendix: Set Up Express Solo |
|
| Express Distro Power Link 2000 |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Link 2000 |
|
| Install Additional Kits |
|
| Install Charging Cables |
|
| Install Cable Management Kit |
|
| Close and Install Covers |
|
| Complete Installation Checklist |
|
| Appendix A: Surface Conduit Entry Kit Installation |
|
| Appendix B: Set Up Power Link 2000 |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| Covers and Panels |
|
| Bus Bar Safety Covers |
|
| Coolant |
|
| Door Fan |
|
| Internal Fan |
|
| Power Link 2000 Controller |
|
| Ethernet Switch (SSLAN) |
|
| Cooling Controller |
|
| Control and Communication Module (CCOM)/Display |
|
| Power Path Lug |
|
| Charging Cable (LCC and Non-LCC) |
|
| Replace the Charging Connector DC Contact |
|
| Replace/Install the Charging Cable CAN Adapter |
|
| Pump and Reservoir Assembly |
|
| External Fan |
|
| LCC Fans |
|
| Holsters |
|
| Area Downlight |
|
| Low Voltage (LV) Surge Suppressors |
|
| High Voltage (HV) Surge Suppressors |
|
| Card Reader Kit |
|
| Card Reader Module |
|
| Standard Cable Management Kit (CMK) |
|
| Tall Cable Management Kit (CMK) |
|
| Smart Antenna |
|
| Ethernet to USB Module |
|
| Tool Balancer Cassette |
|
| Power On |
|
| Post-Service Checklist |
|
| Appendix A: Variation Identification |
|
| Express Distro Power Block 2000 |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Introduction |
|
| Site Planning and Placement |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Introduction |
|
| Prepare for Installation |
|
| Mount Power Block 2000 |
|
| Connect Wires |
|
| Install Covers and Close |
|
| Complete Installation Checklist |
|
| Appendix: Low Clearance Forklift Bracket Lift |
|
| Appendix: Set Up Power Block 2000 |
|
| Express Plus |
|
| Revision History |
|
| Introduction |
|
| Operation |
|
| Operation |
|
| Maintenance |
|
| Maintenance |
|
| Power Block Troubleshooting |
|
| PBC Faults Board Location |
|
| AUX PS Faults Board Location |
|
| CCB Faults Board Location |
|
| Power Link Troubleshooting |
|
| SSLAN Faults Board Location |
|
| UCB Faults Board Location |
|
| MDS Faults Board Location |
|
| FDC Faults Board Location (Power Link 1000) |
|
| SEVB Faults Board Location |
|
| DC MID Meter Location |
|
| FDC Location |
|
| CCB Location (Power Link 2000) |
|
| Cable Faults (Power Link 2000) |
|
| Revision History |
|
| Introduction |
|
| Operation |
|
| Maintenance |
|
| Power Block Troubleshooting |
|
| PBC Faults Board Location |
|
| AUX PS Faults Board Location |
|
| CCB Faults Board Location |
|
| Power Link Troubleshooting |
|
| SSLAN Faults Board Location |
|
| UCB Faults Board Location |
|
| MDS Faults Board Location |
|
| FDC Faults Board Location (Power Link 1000) |
|
| SEVB Faults Board Location |
|
| DC MID Meter Location |
|
| FDC Location |
|
| CCB Location (Power Link 2000) |
|
| Cable Faults (Power Link 2000) |
|
| Conformity - Metering and Calibration Law (Eichrecht) |
|
| Express Plus Power Block |
|
| Express Plus Power Block 160 kW Label Instructions |
|
| Surface Conduit Entry (SCE) Kit Installation |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Block |
|
| Prepare Power Block Pad |
|
| Install Power Block Pedestal |
|
| Install Power Block Enclosure |
|
| Connect Power Block Wiring |
|
| Install Power Block Internal Parts and Fill Coolant |
|
| Install Covers and Door |
|
| Installation Checklist |
|
| Appendix: Set Up Power Block |
|
| Surface Conduit Entry (SCE) Kit Installation |
|
| High Voltage Wire Insulation Resistance Test |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| Panels, Doors, and Safety Shields |
|
| Power Module |
|
| Coolant Level Sensor |
|
| Upper Heat Exchanger (Wet Hex) |
|
| Upper Fan Tray (Wet Box Fan Tray) |
|
| Lower Heat Exchanger (Dry Hex) |
|
| Lower Fan Tray (Dry Box Fan Tray) |
|
| Module Mate Assembly |
|
| Cooling Controller (CCB) |
|
| Power Block Controller Board (PBC, PCBA) |
|
| Ethernet Surge Suppressor |
|
| LV, AC, and DC Surge Suppressors |
|
| Fuse Kit |
|
| Auxiliary Power Supply (Aux PS) |
|
| Power On |
|
| Post-Service Checklist |
|
| Service Bulletin: Express Plus Power Block Pedestal Installation |
|
| Service Bulletin: Faulty Door Sensor Setup Leading to Charging Disruptions |
|
| Express Plus Power Link 1000 |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Power Link 1000 Configuration |
|
| Install Pedestal-Mount Power Link 1000 |
|
| Install Overhead-Mount Power Link 1000 |
|
| Install Cable Management Kit |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Appendix: Set Up Power Link 1000 |
|
| High Voltage Wire Insulation Resistance Test |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| Covers |
|
| Covers Upgrade Kit |
|
| Side Panels (Pedestal Mounted) |
|
| Side Panels (Overhead Mounted) |
|
| Bottom Cap (Overhead Mounted) |
|
| Control and Communication Module (CCOM) |
|
| Front Fan |
|
| Holster and Holster Bracket |
|
| Locking Holster Controller Kit |
|
| Power Link Controller Board |
|
| Bus Bar Safety Covers |
|
| DC Smart Cable |
|
| Contactor Box |
|
| Rear Fan Tray |
|
| Dual Input Contactor Kit |
|
| Maintenance Switch Kit |
|
| Standard Cable Management Kit (CMK) |
|
| Tall Cable Management Kit (CMK) |
|
| Tool Balancer Cassette |
|
| Ethernet to USB Kit |
|
| Power On |
|
| Post-Service Checklist |
|
| Surface Conduit Entry Kit (SCEK) |
|
| Service Bulletins |
|
| Cable Management Kit Tetherballs Upgrade |
|
| Cable Management Kit Vinyl Retention Screws |
|
| Software Corruption Caused by Unexpected Power Loss |
|
| Introduction |
|
| Power Off |
|
| Open |
|
| Repair Procedures |
|
| Close |
|
| End |
|
| Faulty Door Sensor Setup Leading to Charging Disruptions |
|
| Expresss Plus Power Link 2000 |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Link 2000 |
|
| Install Charging Cables |
|
| Install Cable Management Kit |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Appendix A: Surface Conduit Entry Kit Installation |
|
| Appendix B: Setup Power Link 2000 Pedestal-Mount Variation A |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Link 2000 |
|
| Install Additional Kits |
|
| Install Charging Cables |
|
| Install Cable Management Kit |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Appendix A: Surface Conduit Entry Kit Installation |
|
| Appendix B: Set Up Power Link 2000 |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Link 2000 |
|
| Install Additional Kits |
|
| Install Charging Cables |
|
| Install Cable Management Kit (CMK) |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Appendix: Install Forklift Brackets |
|
| Appendix: Set Up Power Link 2000 |
|
| High Voltage Wire Insulation Resistance Test |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| Covers and Panels |
|
| Bus Bar Safety Covers |
|
| Coolant |
|
| Door Fan |
|
| Internal Fan |
|
| Power Link 2000 Controller |
|
| Ethernet Switch (SSLAN) |
|
| Cooling Controller |
|
| Control and Communication Module (CCOM)/Display |
|
| Power Path Lug |
|
| Charging Cable (LCC and Non-LCC) |
|
| Replace the Charging Connector DC Contact |
|
| Replace/Install the Charging Cable CAN Adapter |
|
| Pump and Reservoir Assembly |
|
| External Fan |
|
| LCC Fans |
|
| Holsters |
|
| Area Downlight |
|
| Low Voltage (LV) Surge Suppressors |
|
| High Voltage (HV) Surge Suppressors |
|
| Card Reader Kit |
|
| Card Reader Module |
|
| Standard Cable Management Kit (CMK) |
|
| Tall Cable Management Kit (CMK) |
|
| Smart Antenna |
|
| Ethernet to USB Module |
|
| Tool Balancer Cassette |
|
| Power On |
|
| Post-Service Checklist |
|
| Appendix A: Variation Identification |
|
| Tech Note: Product Variation Identification |
|
| Service Bulletin: Software Corruption Caused by Unexpected Power Loss |
|
| Service Bulletin: Faulty Door Sensor Setup Leading to Charging Disruptions |
|
| Torque Chart |
|
| Express Plus Power Hub |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Concrete Pad Preparation |
|
| Appendix: Wire Landing Locations |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Install Power Hub |
|
| Appendix: Install Riser Kit |
|
| Appendix: Install Second Input Kit |
|
| Revision History |
|
| Introduction |
|
| Operation |
|
| Maintenance |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| Door and Panels |
|
| Ethernet Switch |
|
| Controller Board |
|
| Fuses |
|
| Vent Hood |
|
| Door Air Filter |
|
| Power On |
|
| Post-Service Checklist |
|
| Introduction |
|
| Powering Switch with an External Power Supply |
|
| Torque Chart |
|
| Revision History |
|
| Introduction |
|
| Required Tools and Materials |
|
| Conduit and Anchor Bolt Configurations |
|
| Plan a Future Upgrade |
|
| Assemble the Concrete Mounting Template |
|
| Install the Concrete Mounting Template |
|
| Pantograph Down 2000 |
|
| Revision History |
|
| Introduction |
|
| Site Design Guidelines |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity (NA) |
|
| Appendix: Enclosed Power Link 2000 Considerations |
|
| Revision History |
|
| Introduction |
|
| Prepare for Installation |
|
| Mount Schunk 201 Pantograph |
|
| Mount Power Link 2000 |
|
| Mount PD Controller |
|
| Connect Power Link 2000 Wires |
|
| Install Power Link 2000 Options |
|
| Connect Schunk SLS 201.102 Wires |
|
| Mount Auxiliary Components to Schunk SLS 201 |
|
| Connect Auxiliary Component Cables |
|
| Connect PD Controller Wires |
|
| Complete the Install |
|
| Installation Checklist |
|
| Appendix: Low Voltage Wire Reference |
|
| Appendix: Set Up Power Link 2000 |
|
| Revision History |
|
| Introduction |
|
| Operation |
|
| Maintenance |
|
| Power Link Troubleshooting |
|
| SSLAN Faults Board Location |
|
| UCB Faults Board Location |
|
| MDS Faults Board Location |
|
| SEVB Faults Board Location |
|
| Proton Location |
|
| pantodown-fdc-faults |
|
| Power Block Troubleshooting |
|
| PBC Faults Board Location |
|
| AUX PS Faults Board Location |
|
| CCB Faults Board Location |
|
| PD Controller Troubleshooting |
|
| Revision History |
|
| Introduction |
|
| Power Off |
|
| PD Controller Door |
|
| Vehicle Communication Board |
|
| Status LED |
|
| RFID Antenna Assembly |
|
| RFID Reader |
|
| Wi-Fi Antenna |
|
| Wi-Fi Access Point |
|
| Fuse |
|
| Power On |
|
| Post-Service Checklist |
|
| Express 280 |
|
| Revision History |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Revision History |
|
| Introduction |
|
| Secure Charging Station |
|
| Connect AC Wiring |
|
| Pair Express 280 Charging Stations |
|
| Install Side Panels, Power Modules, and the Touchscreen |
|
| Install Cable Management Kits (CMK) |
|
| Install Cables, Top Cap, and Front and Rear Panels |
|
| Set Up Express 280 |
|
| Installation Checklist |
|
| Install Surface Conduit Entry Box |
|
| Revision History |
|
| Introduction |
|
| Operation |
|
| Maintenance |
|
| Revision History |
|
| Introduction |
|
| Replace the Auxiliary Power Supply |
|
| Replace the Cooling Controller |
|
| Replace the Contactor Box |
|
| Replace the Cable Management Kit |
|
| Replace the Fan Tray Assembly |
|
| Replace the Power Module |
|
| Replace the Power Module Carrier Fan |
|
| Replace the Side Panel |
|
| Replace the Front or Rear LED Diffuser |
|
| Replace a Charging Cable |
|
| Replace the Display |
|
| Torque Chart |
|
| Express 250 |
|
| Revision History |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Concrete Mounting Template |
|
| Install the Surface Mount Plate |
|
| Examples of Express 250 Paired Wire Sizing |
|
| Connectivity |
|
| Adapter Installation Guide |
|
| Revision History |
|
| Introduction |
|
| Secure Anchors and AC Wiring |
|
| Pair the Charging Stations |
|
| Install Cover Panels |
|
| Complete the Installation |
|
| Installation Checklist |
|
| Removing the Express 200 Adapter |
|
| Revision History |
|
| Introduction |
|
| Maintenance |
|
| Reporting |
|
| Revision History |
|
| Introduction |
|
| Standard Service Procedures |
|
| Replace Area Light Bar |
|
| Replace Auxiliary Power Supply |
|
| Add Coolant |
|
| Clean Coolant Fluid Leak From Power Modules |
|
| Replace Cooling Controller |
|
| Replace Contactor Assembly |
|
| Replace Left Extrusion |
|
| Replace Right Extrusion |
|
| Replace Fan Tray Assembly |
|
| Replace Heat Exchanger Assembly |
|
| Replace Holster |
|
| Replace Holster Shroud |
|
| Replace I/O Expander |
|
| Replace LED Display |
|
| Replace Front or Rear LED Diffuser |
|
| Replace Power Module |
|
| Replace Wago Label |
|
| Replace Coolant Reservoir |
|
| Replace Coolant Level Sensor Wire |
|
| Replace Cover Panel Sign |
|
| Replace Station Management Unit (DDC) |
|
| Replace Charging Cable |
|
| Replace Charging Cable with CHAdeMO/NACS Cable |
|
| Replace Swing Arm Assembly |
|
| Replace Touchscreen (CPNK), INT and NA |
|
| Safely Inspecting with High Voltage |
|
| Reseat the SIM Card |
|
| Advanced FRU Guide - Coolant Tube Assemblies |
|
| Advanced FRU Guide - Hall Sensor |
|
| Advanced FRU Guide - Power Module Communication Cables |
|
| Advanced FRU Guide - Touchscreen Lens |
|
| Revision History |
|
| Introduction |
|
| Check Site Readiness |
|
| Install Surface Mount Anchor Bolts |
|
| Install the SCE Box Base and Box Cover |
|
| Revision History |
|
| Express 250 Trade Show Display Unit |
|
| Set Up the Station |
|
| Operate, Transport, and Repack the Charging Station |
|
| 50 kW Label Instructions |
|
| DC Miscellaneous |
|
| Credit Card Chip Reader Pedestal Datasheet |
|
| Credit Card Chip Reader Pedestal Installation Guide |
|
| CARB Label Instructions |
|
| Clean Coolant Fluid Leak Service Bulletin |
|
| Pump Rotation and Coolant Air Purge Service Bulletin |
|
| CP Ready and Compatible |
|
| Alfen |
|
| Alpitronic |
|
| Introduction to Partner Portal |
|
| Work Orders Overview |
|
| Filter and Sort Work Orders |
|
| Review and View Work Orders |
|
| Accept a Work Order |
|
| Using the Collaborate Tab |
|
| Assign a Technician |
|
| Manage a Shipped Work Order |
|
| Place Work Order On Hold |
|
| Complete a Work Order |
|
| Other Work Orders |
|
| Onboard and Offboard a Technician |
|
| Miscellaneous |
|
| ChargePoint DC Station |
|
| Open Source Software Notice |
|
| End of Life |
|
| CPF32 |
|
| Introduction |
|
| Civil and Mechanical Design |
|
| Electrical Design |
|
| Connectivity |
|
| Pedestal Mount Concrete Preparation |
|
| Setup and Installation |
|
| Introduction |
|
| Install the Pedestal |
|
| Install Bracket and CMK |
|
| Install Station and Charging Cord |
|
| Prepare to Activate on the ChargePoint Network |
|
| Troubleshooting |
|
| Grounding and Wiring |
|
| Prepare Installation Site |
|
| Install the Power Share Kit |
|
| Install or Replace Signs |
|
| Introduction |
|
| Install a Station without a CMK |
|
| Install a Station with a CMK |
|
| Install Charging Cord and Covers |
|
| Prepare to Activate on the ChargePoint Network |
|
| Troubleshooting |
|
| Grounding and Wiring |
|
| Install or Replace Signs |
|
| Introduction |
|
| Scope of Maintenance |
|
| Reporting |
|
| CPF25 |
|
| Setup and Installation |
|
| Meet ChargePoint Home |
|
| Instructions for Professional Electricians |
|
| Introduction |
|
| Install the Pedestal |
|
| Install Bracket and CMK |
|
| Install Station and Charging Cable |
|
| Prepare to Activate on ChargePoint |
|
| Troubleshooting |
|
| Grounding and Wiring |
|
| Prepare the Installation Site |
|
| Install the Power Share Kit |
|
| Install or Replace Signs |
|
| Verify Station Wiring and Voltage |
|
| Troubleshooting |
|
| Removing a Stuck EV Connector |
|